Chain Inclinometer Configuration Versioning
Overwriting length or reference changes the meaning of history. See how to separate configuration versions and their validity periods.
- Why configuration changes the result
- The key rule: measurement time selects the version
- Overwriting versus a new version
- Scenario: replacing a segment in an operating string
- What should belong to a version
- Three version states: draft, active and withdrawn
- Activation is an engineering operation, not an administrative one
- Checklist for activating a new version
Read article
12 min read