Structural Monitoring Data Specification for the OPZ
How to describe data in a structural monitoring OPZ so bids are comparable, acceptance is measurable, and the full history can be handed over after the contract ends.
- Why a sensor-heavy OPZ can be empty at the data layer
- Ten items without which data cannot be accepted
- Identifier, time and unit: three things that must survive a name change
- Four data layers that must not be mixed together
- How to write data quality so the "green panel" does not pass acceptance
- Illustrative example: one hour, three different truths
- Acceptance tests: the contractor must show operation, not slides
- How it looks in Inclify
Read article
13 min read